Pre-dive Check IS-MIX
- Fill the gas cylinders
- Fill the buoyancy and bail-out gas cylinders
- Checking and assembly of buoyancy compensator
- Prepare the IS-MIX for assembly
- Check of the gas composition
- Set the dosage selector
- Check and assemble the gas cylinder
- Filling canister
- Fit the canister into the canister housing
- Check the IS-MIX's gas pressure
- Check the dosage
- Check and fit full face mask
- Check the warning time with by-pass reset
- Check the warning time with bellows reset
- Check the breathing resistance
- Check of reserve gas valve and tightness of IS-MIX
- Mount and check the bail-out breathing valve and DPX
- Fit the cover and diffuser
- Control measurement of magnetic signature
- Pack the IS-MIX for transport to the dive site