Buoyancy compensator

Buoyancy compensator

  1. Hang the buoyancy compensator inflated for drying. After a period of drying, drain the jacket of any residual water through the bottom drain valve.
Note: NOTE:If full drying is not possible before packing into the transport and storage box, a new reset and an extended control must be made prior to commissioning of the equipment (sent to storage), a non-conformance report must be written and a copy of this should be added along with the equipment in the transport and storage box.