Field preparation

Field preparation

  1. Replace gas supply. Make sure the connections are clean and dry before installing a new gas supply.
  2. Check that the dosage selector is set to the position that corresponds to a new gas supply and the planned dive.
  3. Place the IS-MIX on its end and attach the canister lid and then use the canister.
  4. Dry the canister housing if necessary. Check that the O-rings on the canister sleeve and canister lid are correctly fitted and that the canister lid is dry. Fit a new canister and then the canister lid .
  5. Check tightness in accordance with section Check of reserve gas valve and tightness of IS-MIX on page 77.