Emergency situations overview
Check during dive |
Criteria |
Failure |
Action |
Pressure gauge pressure |
<20 bar |
>20 bar |
- Close cylinder valve on IS-MIX - Check that the reserve gas valve is pulled - Perform by-pass and check that the pressure is <20 bar - Consider aborting the dive if IS-MIX cylinder gas is different than DPX gas. |
Reserve gas valve |
Pulled out |
Pushed in |
- Pull out reserve gas valve - Make sure IS-MIX cylinder valve is closed |
Bypass Function |
Flow |
No flow |
- Open IS-MIX and bail-out cylinder valves - By-pass - Abort dive - Perform emergency decompression schedule |
IS-MIX warning. (breathing resistance) |
- By-pass - Perform functionality checks (Abort the dive if receiving repeated warnings, use by-pass during ascent) - Open IS-MIX and bail-out cylinder valves - Use switch-over valve - Perform emergency decompression schedule |
||
Diver trapped due to DPX hose tangled |
- Open IS-MIX cylinder valve and bail-out cylinder valve - Release DPX connection (follow DPX diving hose to surface if possible) - Abort dive - Perform emergency decompression schedule |
||
Critical IS-MIX failure |
- Use by-pass during inhalation - Use switch-over valve - Abort dive - Perform emergency decompression schedule |