Check functionality during dive (Surface attendant)
These operations shall be followed regularly during dive.
Regularly check both pressure gauges - only one gas side shall be pressurized.
Regularly check that the operating pressure is over > 60 bar.
- When pressure reaches 60 bar – change to new gas cylinder with the same gas
Note: WARNING! Switching from Deep gas to Deco gas is not allowed.